EXP1丨18 sketches


Draw a series of 9 sections exploring the relationship between two of the projects you chose and the ground line as a datum. Use a range of carefully hatched lines to signify where the section cuts through solid material and to indicate what that material might be. Ensure that the material surrounding the Architecture below ground level is shown as solid.

Chosen Clients

Client 1: CJ Hendry
Client 2:Revivial Cycles

18 Sketches



    1.
    • Adj 1: Cracked

    • Adj 2: Tilted

    2.
    • Adj 1: Cracked

    • Verb 2: Spin

    3. 
    • Adj 1: Cracked

    • Noun 2: Irregularity




    4.
    • Verb 1: Placed

    • Adj 2: Tilted



    5.
    • Verb 1: Placed

    • Verb 2: Spin


    6.
    • Verb 1: Placed

    • Noun 2: Irregularity




    7.
    • Noun 1: Fluidity

    • Adj 2: Tilted

    8.
    • Noun 1: Fluidity

    • Verb 2: Spin

    9.
    • Noun 1: Fluidity

    • Noun 2: Irregularity






    10.
    • Adj 2: Tilted

    • Adj 1: Cracked




    11.
    • Adj 2: Tilted

    • Verb 1: Placed


    12.

    • Adj 2: Tilted

    • Noun 1: Fluidity



    13.
    • Verb 2: Spin

    • Adj 1: Cracked

    14.
    • Verb 2: Spin

    • Verb 1: Placed


    15.
    • Verb: Spin

    • Noun 1: Fluidity

    16.
    • Noun 2:  Irregularity

    • Adj 1: Cracked


    17.
    • Noun 2:  Irregularity

    • Verb 1: Placed

    18.

    • Noun 2:  Irregularity

    •  Noun1: Fluidity

    Comments